推土机载荷谱研究与开发(Ⅰ)——推土机现场作业时多参数的实时测试

    The Multi Parameter Test of Dozer on the Working Spot The first paper of series “load spectrum study and development of dozer”

    • 摘要: 通过对推土机现场作业时的工作装置、传动系和主要结构件的动态工作载荷和工作应力的测试与分析,获得其在各种典型工况下的特性,为整机及各部件设计与性能分析提供依据

       

      Abstract: The performance of dozer under the typical operating condition were obtained through tests and analysis for the working equipment, transmitting units and major structures on the working spot. The results can be as scientific basis for design and analysis of dozer and its parts.

       

    /