    • 摘要: 为了提高中压电力网的规划水平,该文以最短路径和最小负荷矩法为基础,考虑物理约束、道路、支路电流和节点电压等约束条件,提出了确定主干线、连接负荷点方法和自动搜索交叉点(中间节点)以及选择导线截面的方法,给出了线路拉手前后节点和支路编号的方法,并且可以自动搜索相邻线路的联结点,实现相邻线路的手拉手连接,最终实现相邻2条自线路的自动布线。并且以农网的实际数据为例,进行计算、分析和比较,结果表明,该文提出的方法可以自动形成网架,确定网络中各支路的型号,保证相邻2条线路在拉手前后的支路电流、有功功率损耗率和节点电压均满足约束条件,是一种有效的网架优化规划方法,可以为配电网网架的规划提供必要的数据和技术支持。

       

      Abstract: The purpose of this paper was to improve the planning level of medium voltage distribution network. On the basis of the shortest path and minimum load moment algorithm, and under constraint conditions such as physical conditions, branch current, node voltage conditions, and so on. The method was proposed, which could be used to determine the main line, to connect load node, to automatically search the cross point (intermediate nodes), and to select section of the lines. The ordering technology of nodes and branches were presented before and after the lines connected, and the adjacent join points between two lines could be automatically searched for connecting adjacent lines hand in hand. Finally the function of automatic routing was achieved between adjacent lines. By calculation, analysis and comparison of the actual data from rural power network, the real example planning results showed that the proposed approach could automatically form network, choose the type of each branch of the network, ensure the branch current, active power loss rate and node voltage of the two lines in the area of constraints before and after the lines were connected, and indicated that it was an effective optimal planning method of distribution network. The method could provide the necessary support of data and technology to optimal planning distribution network.

       

    /